HOT WORK DAILY PRE-START CHECKLIST

To be completed by the worker or contractor prior to starting hot work each day. This checklist is used to ensure all required safety precautions are in place before any hot work begins. It includes general safety checks, environmental controls, and fire watch preparation. The completed checklist must be kept on-site for the duration of the project.

MM slash DD slash YYYY

GENERAL SAFETY PRECAUTIONS

1. Communication device(s) (i.e., cell phone) is available for immediate use in case of an emergency.(Required)
2. Fire extinguisher and safety devices (i.e., smoke eaters, welding screens) are present, in service and in good operating condition. Note: Extinguishers to be UL Type 4A40BC per Construction Reg. 213.(Required)
3. Identification of Smoke/fire detectors affected AND that the certified electrician has confirmed devices are disabled.(Required)
4. Sign all affected fire alarm pull stations as not in service, indicate the nearest active pull station.(Required)
5. Hot Work equipment is in good operating condition.(Required)
6. An assessment and steps have been completed to mitigate worker risks when completing the work (i.e., ventilation needs, air purging/scrubbing).(Required)
7. Appropriate Personal Protection Equipment is provided and in good operating condition.(Required)

REQUIREMENTS WITHIN 10 METRES OF HOT/DUST WORK

8. Work Area is clearly delineated with signs and/or barriers to restrict access and exposure.(Required)
9. All sprinkler heads and smoke detectors are covered if they are vulnerable due to the work.(Required)
10. Ventilate the area with appropriate ventilating equipment, if there is a risk due to smoke or dust exposure.(Required)
11. Suspend any nearby activity that could constitute a risk (dust collector, nearby painter, use of solvents or glues etc.).(Required)
12. There is No risk of explosive atmosphere, or it has been eliminated (gas, vapours, dust).(Required)
13. All flammable liquids, dust, powders and oily products have been removed.(Required)
14. All combustible materials have been removed from the work area.(Required)
15. Floors are swept and clear of debris.(Required)
16. Openings in ceilings, floors and walls are protected.(Required)
17. All other hazards that may result in damage, injury or loss to personnel and property are identified and controlled.(Required)

HOT WORK MONITORING (DURING AND AFTER WORK)

18. A trained Hot Worker has been assigned.(Required)
19. The Hot Worker was provided with suitable extinguishers.(Required)
20. Workers are trained in use of equipment, sounding the alarm and notifying Department of University Safety.(Required)
21. A Fire Watch provided for 60 minutes after the completion of work, or for 3 hours after the completion of open flame torch work (2 hours if a hand held thermal scanner is used)(Required)
22. All devices protected and covered prior to the start of work are uncovered and able to operate properly(Required)

MM slash DD slash YYYY