New chilled water piping is being installed between the Steacie Building and ARISE buildings until the end of July, 2019.  A section of the service tunnel and part of the pedestrian tunnel near Steacie Building is under construction, but pedestrian access will be maintained at all times.

Please be aware that the work requires occasional drilling into concrete which can reverberate into Steacie and Herzberg, and may also be heard in the Loeb Building.

Facilities Management and Planning appreciates your patience and co-operation.