In the period of Mon- Wed, June 24-26, the contractor will be performing work inside the pedestrian tunnel at the tunnel junction near the Nicol Building.

Pedestrian and cart access will be maintained at all times, however, the tunnel width may at times be narrowed down to the width of a single cart.

Facilities Management and Planning appreciates your co-operation.