The pedestrian pathway along the Rideau River is now closed as part of City of Ottawa preparations for the future construction of a pedestrian bridge to Vincent Massey Park.

The pathway along the river will be closed from the O-Train tracks to the Loeb Building until December 2021.

In addition, an area on the south side of Richcraft Hall has been designated for city construction equipment.

There will be signage around the area to ensure pedestrian and traffic safety.