- History
- Architectural Features
- Historic Site Recording and Assessment
- Building Renewal Project
- Community Dialogue
Photo Credit: Fangliang Xu
History
The Dominion-Chalmers United Church in downtown Ottawa was born from a merger in 1962 of Methodist and Presbyterian churches, two Protestant denominations that began in the 1800s to meet the spiritual needs of Bytown pioneers.
The Methodist stream started in 1862 and eventually became Dominion Methodist Church, which opened on Metcalfe and Queen streets in 1876. It was renamed Dominion United Church in 1925 and was destroyed by fire on Feb. 4, 1961.
The Presbyterian stream began with St. Andrew’s Presbyterian Church in 1828. Knox Presbyterian was established in Sandy Hill in 1844 by St. Andrew’s members sympathetic to the tenets of the Free Church of Scotland and Bank Street Presbyterian Church was eventually built to accommodate the increasing population on the west side of the Rideau Canal. Chalmers Presbyterian Church at the current location at the corner of O’Connor and Cooper streets was inaugurated in 1914. It left being Presbyterian and joined the new United Church in Canada on its formation in 1925, becoming Chalmers United Church. It was rebuilt after major fire damage on April 10, 1955.
The official inaugural services of Dominion-Chalmers United Church were held on June 10, 1962, marking the end of a tumultuous 16 months for two of Ottawa’s oldest downtown congregations.
Within days of the Dominion United Church fire in 1961, a building committee was formed to prepare plans to rebuild on its downtown site. Over the next few months, during which the congregation worshiped first in the Capitol Theatre and then the Ottawa Technical High School, the committee presented at least two plans to rebuild but both were unacceptable to most of the congregation.
At the annual meeting of Dominion Church on Feb. 1, 1962, the committee was empowered to explore other possibilities, including a possible merger with another congregation. Chalmers Church had been providing meeting space and other facilities for various groups of the Dominion congregation. Indeed, the two congregations had been holding joint summer services for several years.
Late in 1961, when the plans for the future of Dominion Church were still unresolved, the Chalmers session and official board invited the Dominion leadership to form a Joint committee “to discuss the desirability of the two congregations considering a basis for union.” The invitation was accepted.
The joint committee held its first meeting on Feb. 15, 1962. After only two more meetings of the full committee and one meeting of a drafting sub-committee, the joint committee was able to submit its recommendations for the amalgamation of the Dominion and Chalmers churches by March 9, 1962.
The Dominion congregation accepted the recommendation by a three-to-one majority at a special meeting on March 30, 1962 and gave its full approval unanimously after hearing the complete details of the merger at a special congregational meeting on April 25, 1962.
The amalgamation of Dominion and Chalmers churches as “Dominion-Chalmers United Church” was approved by the Presbytery on April 26, 1962.
The official inaugural service took place on the 37th anniversary of the founding of the United Church of Canada.
The significance of the amalgamation was captured in the closing words of the account of the events of 1961-1962 in the 1963 Dominion-Chalmers Year Book:
“Such is the story . . . of how two historic congregations in downtown Ottawa resolved to become as one, symbolizing in their own purpose a unity which has been exemplified by the very existence of the United Church of Canada.”
Architectural Features
Architectural Design: Gable roofed main block with prominent corner tower. Nepean sandstone walls with wallace sandstone trim, leaded windows, Romanesque detailing of openings.
Architectural Style: Byzantine Revival
Historic Site Recording and Assessment
At the time acquisition in 2018, Carleton University students completed a special project as part of a Historic Site Recording and Assessment course. Learn more about Carleton University’s special project.
Building Renewal Project
CDCC is planning a building renewal project that shall pay homage to the building’s historical and heritage characteristics, alongside revitalizing all spaces with updated finishes and state-of-the-art equipment/technology. The renewal project is to be systematically planned for rollout over various phases of work, maintaining a seamlessly integrated design from room to room. All products and equipment are to be of highest quality for a professional user experience and for long-term use. All rooms are to be considered flex or multipurpose spaces to host a range of activities. Safety, accessibility and crowd management to be reflected throughout. Special attention in planning required for extensive sound proofing, installation of advanced audio/visual/lighting equipment, installation of a building-wide modern connectivity systems (such as Dante ethernet network), integrating the downtown building to campus communication/security systems, and beyond.
Community Dialogue
On May 28, 2019, members of the Ottawa community gathered together for a Community Dialogue at Carleton Dominion-Chalmers Centre. The Community Dialogue was held for members of the community at large (including university staff/ students, current CDCC user groups, church congregation, community arts organizations, independent artists, and beyond). The event included a tour of the building to showcase a baseline representation of the space, round table discussions to propose ideas for community programming or collaborations, and a question/answer period to receive inquiries about Carleton University’s new and evolving Arts, Performance and Learning Centre.
The ideas and feedback shared at the community dialogue were constructive and heartfelt. Each participants contribution is cherished.
Through the process of collated all notes taken during the roundtable discussions, there were clear topics/ categories that developed as follows:
- Local Community
- Building & Equipment
- Religion
- University Students
- Research
- Pricing
- Marketing
- Performance
- Programming/Outreach
Time, finances, human resources and strategic planning for CDCC shall be contributing factors to how each singular item may be reviewed and considered from each category. However, in response to the “Hopes and Dreams” of the community, a minimum of one to two items from each category is being pursued in the summer and fall of 2019.
Future Community Dialogue events will be hosted to maintain open and ongoing communications.
Projects originated from the May 2019 Community Dialogue include:
Focus | Feedback/Idea | Action | Date |
Building & Equipment | Storage space for musical instruments | Reconfiguring archives room to be a new home for large keyboard instruments including a harpsichord and practice Carillon. | Aug 2019 |
Local Community | Be available for the local community groups | CDCC hosted Centretown Community Association monthly meeting, and CCA subsequently hosted their Bicycle Safety Workshop alongside City of Ottawa and Bike Ottawa. | Jun 2019 |
Religion | Continue existing church congregation programs | Dominion-Chalmers will continue programming outreach programming in 19/20 with “TOG – Time Out with God,” “DC Harmony,” and beyond. | Sep 2019 |
University Students | Provide jobs for students to help run the facility | Various work-study and practicums being offered. | Sep 2019 |
Research | Storytelling, interview people based on the building and its history | A curated, oral history project being planned with members of the Dominion-Chalmers congregation. | Sep 2019 |
Pricing | Allow rates for non-profit organizations | Corporate vs non-profit pricing being established. | Sep 2019 |
Marketing | Online Forum | A communication tool is being rolled out as part of the new website to allow for the sharing of ongoing ideas and feedback for CDCC. | Aug 2019 |
Performance | Solo piano to full orchestra programming | Carleton University will be hosting a “Welcome Back Organ” solo organ event in September 2019 to celebrate to newly revitalized pipe organ at CDCC. And in April 2020, the university will be hosting the internationally renowned Ukelele Orchestra of Great Britain. | Sep 2019 |
Programming/ Outreach | Youth homelessness programming | CDCC will be hosting Discovery University programming weekly in the fall and winter terms. | Sep 2019 |