Home / Construction Notices
Friday, February 17, 2023
Due to work that the City of Ottawa is required to do on the O-Train tracks, University Drive – from Richcraft Hall to Raven Road – will be completely closed nightly from 11 p.m. to 6 a.m. starting Wednesday, Feb. 22 to Sunday, Feb. 26. Please note that the road will remain open from... More
Facilities Management and Planning (FMP) is upgrading the stairwells in the Loeb building to bring them up to current building code standards. This project will begin the week of Feb. 21 and continue into early June 2023. Below is the schedule of work, which was developed in collaboration with the Dean’s Office and other... More
Friday, November 25, 2022
On Tuesday, Nov. 29 and Wednesday, Nov. 30, there will be paving on Campus Avenue from the construction site of the new student residence to Parking Garage 18. Access to the parking garage will be maintained, but that section of Campus Avenue will be reduced to one lane, with flag persons on site to... More
Thursday, November 24, 2022
On Tuesday, Nov. 29 from 9:30 a.m. to noon, University Drive, at the ARISE building, will be reduced to one lane to allow for the delivery of drywall and other materials using a boom truck. The material will be hoisted through a window on the second floor of the building. There may be minimal... More
Please be advised that Library Road will be reduced to one lane on Saturday, Nov. 26 from 7 a.m. to 3 p.m. A crane will be in place to facilitate the replacement of equipment on the roof of the Tory Building. Flag persons will be onsite to direct traffic and pedestrians around the work... More
Tuesday, November 15, 2022
Work to install new soffit on the exterior of Dunton Tower will continue until mid-December. Scaffolding is being installed today, and the work will continue for an estimated four to five weeks. During this time, access to the building will be available through the main entrance from the academic quad only. All other exterior... More
Wednesday, October 26, 2022
From Saturday, Oct. 29 to Wednesday, Nov. 2, the main entrance to Richcraft Hall will be temporarily closed to allow Facilities Management and Planning to replace damaged tile. There may be noise on Saturday, Oct. 29 and Sunday, Oct. 30 as the contractor removes the old tile. During the closure, access to the building... More
Wednesday, October 12, 2022
As part of the renovations to the Senate Room on the 6th floor of Robertson Hall, two electrical shutdowns are required which will impact the 5th and 6th floors only. On Monday, Oct. 17: Starting at 6 a.m. a brief test of the breakers will be done. This will take 15-30 minutes and power... More
Friday, October 7, 2022
Excavation for the sewer, storm, and water mains in the area between Paterson Hall and Southam Hall will begin on Wednesday, Oct. 12. This work is expected to be completed in early December 2022. As a result, the exterior tunnel entrance door on the east side of Southam Hall will be blocked off so the... More
Monday, October 3, 2022
As part of the work being done in the area on the west side of Paterson Hall, repairs are required to a portion of the tunnel system. To ensure the safety of our campus community while these repairs are conducted, the section of the tunnel located from the Tunnel Junction (near MacOdrum Library) to... More
Monday, August 29, 2022
As part of the construction for the new student residence, the contractor needs to tie into the water main. This work will be taking place on Tuesday, Aug. 30 and Wednesday, Aug. 31 and means that there will be reduced water pressure across campus from 7 a.m. on Aug. 30 to 5 p.m. on... More
Library Road will be temporarily down to one lane on Aug. 30 and 31 from 5:30 a.m. to 5 p.m. each day. This temporary lane closure is required to allow for a crane to be located in the area to complete roof work on the Minto Building. Signage and flag persons will be on... More